Willow clippings in the freezer. 4/11/05
|
Bulldozer making the first "trail" through the project area. 5/13/05
|
Upper end of project area after tree clearing. 5/13/05
|
Volunteer, Adinda Demske, standing near the largest waterfall at med-high water. 5/14/05
|
Project assistant, Brian Winnestaffer, clearing trees in the area of the new stream alignment. 5/23/05
|
Excavator working at upper end of project area. 5/17/05
|
Brian standing on pile of cottonwood logs cleared from the new stream alignment. 5/19/05
|
Pam and Jennifer visiting the project site. 5/20/05
|
Brian and project engineer, Chris Roach, surveying at the site. 5/20/05
|
Jenni and Uncle Albert standing in front of root wads.
|
Kim and Clan Grandmother Katie Wade talking w/Brian at the project site.
|
Excavator and survey work at upper end of project area. 5/20/05
|
Brian walking the new alignment, which is marked with red stakes. 5/24/05
|
Waterfall at high water. 5/24/05
|
A rock truck and bulldozer creating a pile needed to divert the creek. 5/27/05
|
Brian, Doug and Kevin "discuss" the project.
|
Bulldozer and excavator create the new stream channel and floodplain. 6/7/05
|
The rock truck fording the creek on a high water day. 6/11/05
|